I just installed the last piece of z trim and now we re ready to install the hip cap.
Metal hip roof ridge cap installation.
For a longer ridge move along the ridge repeating.
I am installing a metal hip roof and am concerned about the possibility of leakage around the hip caps seams.
You cut z trims for the top of your panels.
See the illustration below.
Center a piece of ridge cap on the building peak.
Although ridge caps can come as shingles and may have a feature such as the ability to self vent or include a skylight the.
Applicable for ultravic supervic 7 8 corrugated barnmaster.
First we re going to put the hip cap in place and mark it so that we can prepare the end here at the eave and the top at the ridge.
We re going to get the hip cap in place and let it overhang at the eave so that i can make.
Preparing the eave ridge cap ends.
Metal roofing ridge cap installation steps.
Our host david mackey discusses techniques used in installing ridge cap using the sl 16 standing seam roofing system from american building components.
How to install ridge cap foam closures on a metal roof for a non vented ridge cap.
What can i do to seal these gaps.
With new laminated hip and ridge cap shingles finishing a roof installation with a ridge cap is a much simpler process than with the old three tab shingles.
The installation of the ridge cap is the same as the hip cap.
Apply butyl tape sealant at to the inside of the chalk line on both sides of the ridge cap.
In summary to install the ridge cap shingles you simply separate them where they are perforated bend them over the peak and nail them down.
The ridge cap covers the seams but leaves gaps underneath due to the ridged profile of the roofing.
We use a z trim and make sure to have tape seal underneath the z trim and between the ridge cap and the top of the z.
The ridge cap is the last thing to put on when installing a metal roof.
Make a mark at the cap s lower edges both sides at one end of the ridge.
And on the other side the ridge is closed.
If the ridge is only 15 20 long repeat step 1 at the opposite end of the ridge.
You use your ridge cap to mark the ribs so that you know where to place the z.