We are using 3 5 8 metal studs and the ceilings are 10 high.
Metal stud framing drop ceiling.
54mil 16ga 68mil 14ga and 97mil 12ga products are produced with 50ksi steel unless otherwise noted.
Single jamb stud.
Cp60 g90 available additional member depths of 7 1 4 9 1 4 11 1 2 13 1 2 and 14 are also available.
I am framing 10 x 10 rooms in a space with the acoustical ceiling already in place.
The metal tracks and studs are installed firmly therefore the frame is perfectly level as we have used the laser level.
33mil 20ga and 43mil 18ga framing products are produced with 33ksi steel.
Insert the upper ends of each wall stud into the channel of the ceiling track.
For low clearance areas they also come in 1 5 8 inch widths.
Steel studs are beneficial for building ceilings because they are straight light and can be purchased in longer lengths than wood studs.
Runner securely attach runners.
Steel studs are light and useful for many construction projects.
Use two 3 4 inch self tapping screws through each side of the track to secure metal studs in the channel.
Back to back header reduces web crippling reinforcement requirements.
Do i just screw the top track to the ceiling grid with the same screws used for attaching the studs to the track.
Viperstud drywall framing studs and track structural stud and track shaftwall and area separation systems plastering steel and drywall finishing products as well as our framerite family of proprietary products.
Marino ware offers a complete line of cold formed steel framing products.
Rigid structural support for gypsum wallboard veneer plaster or drop ceiling assemblies.
Make sure you install the metal studs every 15 25 otherwise they won t be able to support the weight of the plasterboards.
Our metal framing product line includes.
Infill stud use of cripple stud to receive head sill tracks at jamb studs helps maintain alignment of finishes.
Boxed jamb studs welded together reduces material build up and finish problems.
The metal stud ceiling frame is completed after about 3 hours of continuous work.
In a ceiling assembly u channel is suspended from the overhead structure using hanger wire.
Drywall furring channel is commonly clipped with metal furring channel clips or wire tied perpendicular to the underside of the u channel at appropriate intervals for screw attaching drywall.
Steel stud framing for non load bearing interior partitions is secured to floors and ceilings with runners fastened to the supporting structure.